Tuesday, May 6, 2014

Hobby Update - Neck and Leg

Sholder prepped with pin. 

And mounted

What the examples spine looks like

Base of spine pinned

Joints cut

Base of spine mounted for glue and greenstuff to dry. Left spine alone for rest of night. Will have to build slowely to give proper time to dry. 

With time left decided to start legs. This is a close up of foot. 

Getting first leg framed. Cut second so the would be close to the same length. 

First foot. Made basically only from scrap. 

Next time I will extend the spine a little and work on mounting the leg to the foot. Once its all set, dried and internally pinned I will attach it to the body. That way I can build the second leg in a way that it will touch the base. Going to make sure to run brass pins in the leg to privide the support. The model wont weigh much but I still dont want it falling apart. 

No comments:

Post a Comment