Where we left off
First thing is to get the rock ready fir yhr walls.
Here is after a few rounds of pours.
Here is some dry fitting with pins. Sean uses the rocks when still wet to smush them together for better blending and then baked them in the oven to get them final faster.
We took a break to get the lights prepped in the building.
Here is the inside of the building with the lights installed but before the top floor os put in.
Some more views. You can see the added foil to reflect the light a little more.
Top section installed.
And the other part of the model.
And we have light
And this is how the day ended, buildings installed and rocks started.
No comments:
Post a Comment