Anyways, first thing I did was lower the rear end some to get a softer angle. Then I installed the tubes and cauldrons onto the other raiders.
Then I finished off the crew, just needing to put on the stormvermin left arms and heads.
With that done, all I am missing is the propeller set up. Thats going to take a little more work.
Started with aproximating the height. Went with a level a little higher than the halbreds.
Im using a metal rod with a plastic core that also act to pin it into the hole.
I picked up a few propellers at the local hobby shop. Im going to mess them up as part of the finishing touches.
To make the thing run I need steam power. Luckily I saved some parts from when I demolished the doom wheels for the Iron Daemon I saved the half I had clipped off.
No comments:
Post a Comment